Everyone on shift sees the same values and the same alarms. Calls arrive on the plant clock and escalate to a trip. A tripped plant stays down until someone finds the cause and presses the trip reset. Any worker may do any job; a hat only tells the others what you are watching.
Use these names and types. Add any tag marked CREATE; choose the logic and rung structure yourself.
The live plant is one shared Plant 7 that runs all day whether or not anyone is clocked in. Every worker sees the same values and the same alarms. Calls arrive on the plant clock, escalate from warning to critical, and end in a trip. A tripped plant makes nothing and stays down until someone submits the failed I/O tag and then presses the area trip reset pushbutton beside the field HMI, or the master panel in the control room. The reset only clears a trip whose cause is gone.
Workers signed in from KAX City are paid by the city for closing a call, for helping on one, and for restarting the plant. Visitors can do all of the same work and are not paid. The hats on the shift board are optional. Press R for the radio and the open line to everyone on shift, and O at any time for the 0xSCADA operator station when one is connected.
You are T. Ryder, Plant 7's probationary controls technician. The plant failed an alarm-management audit. Shift Supervisor Frank Kowalski controls your work orders; Plant Manager Dana Voss controls whether you remain in the program. Every delay, unsupported answer, escalation, and shutdown is recorded.
Follow the amber route immediately, take the assigned work, prove the required result, and report for debrief. Management will interrupt when you waste time. The qualification log records all 21 assignments and does not erase poor response history.
Programming assignments open only from the marked ESCO workstation and remain locked until your actual project passes the requirement. Live production calls enable the prebuilt HMI with H and controller diagnostics with Tab. The brief gives context and one conceptual hint, never a completed rung or HMI answer.
Travel to the affected equipment, compare field evidence with HMI values, logic, trends, and radio reports, then press Enter and submit the root-cause I/O tag such as TCV-2208.
TIER 1 — WARNING → TIER 2 — CRITICAL → TIER 3 — PLANT SHUTDOWN
Escalation windows are 95 seconds on early calls, 75 seconds on normal calls, and 55 seconds on hard calls. A shutdown is a strike and still requires an incident cause. Three strikes terminate the shift and send the failed assignment back to dispatch.
WASD move · Shift run · E interact · M plot plan · R radio and shift line · H live HMI · Tab live logic · O 0xSCADA operator station · Enter submit root cause · Esc pause
The acceptance run is closed. The permanent record remains available for review.
Minimum Plant 7 qualification standard met. Technician is cleared for supervised controls work. Any future unsupported change, missed trip, or bypassed safety condition will reopen this review.
RECORDED --