+
TECH T. RYDER
DUTY 00:00
QUALIFIED 0 / 21
MANAGER REPORT OVERDUE
CALL SCORE 0
STRIKES ○○○
x1.0
PLANT 7 SHIFT BOARD

VISITOR - NOT PAID. Sign in at KAX City

⚠ WARNING
TAH-2210 DT TRAY 4 TEMP HIGH
02:00 TO ESCALATION
PLANT 7 QUALIFICATION Report to dispatch

Reliability Center-- m
▲AHEAD
[E] Use HMI Terminal
WASD MoveSHIFT RunE UseM Plot planR RadioO 0xSCADAESC Pause
⏎ SOLVE PROBLEM
PRAIRIE GOLD PROCESSING
ALARM STATE
SOYBEAN EXTRACTION & REFINING · MAPLE JUNCTION, IOWA · PLANT 7
THE LIVE PLANT · SHARED · ALWAYS RUNNING
Checking sign-in. SIGN IN AT KAX CITY
TRAINING · SINGLE WORKER · UNPAID
0 of 21 assignments complete
BACK TO KAX CITY
Plant 7 failed its alarm audit. Dana Voss is watching every response. Unsupported answers, slow work, and shutdowns become part of your permanent qualification record.
PLANT 7 · THE LIVE PLANT

SHIFT BOARD

ONE PLANT. IT RUNS WHETHER OR NOT ANYONE IS HERE.

Everyone on shift sees the same values and the same alarms. Calls arrive on the plant clock and escalate to a trip. A tripped plant stays down until someone finds the cause and presses the trip reset. Any worker may do any job; a hat only tells the others what you are watching.

CLOCKING IN ASVISITOR

SIGN IN AT KAX CITY

OPTIONAL HAT
TODAY
WHO IS ON SHIFT
BACK TO KAX CITY
CONNECTING TO PLANT 7
0xSCADA · PLANT 7 OPERATIONSControl room operator station
PRAIRIE GOLD · PERSONNEL RECORDPLANT 7 QUALIFICATION LOG
WEEK 1 · WORK ORDER

Mission

PLANT NOW

PRODUCTION EXPOSURE

NON-NEGOTIABLE GATE

PROGRAMMING REFERENCEMISSION VARIABLE BANK

Use these names and types. Add any tag marked CREATE; choose the logic and rung structure yourself.

ESCO AUTOMATION STUDIO · LIVE PROJECTCV-101 Engineering Workspace

CONNECTING
MISSION REFERENCEMISSION VARIABLE BANK

Use these names and types. Add any tag marked CREATE. The bank does not prescribe a rung solution.

NEW TECHNICIAN ORIENTATION — PGP PLANT 7

The live plant

The live plant is one shared Plant 7 that runs all day whether or not anyone is clocked in. Every worker sees the same values and the same alarms. Calls arrive on the plant clock, escalate from warning to critical, and end in a trip. A tripped plant makes nothing and stays down until someone submits the failed I/O tag and then presses the area trip reset pushbutton beside the field HMI, or the master panel in the control room. The reset only clears a trip whose cause is gone.

Workers signed in from KAX City are paid by the city for closing a call, for helping on one, and for restarting the plant. Visitors can do all of the same work and are not paid. The hats on the shift board are optional. Press R for the radio and the open line to everyone on shift, and O at any time for the 0xSCADA operator station when one is connected.

Training: your assignment

You are T. Ryder, Plant 7's probationary controls technician. The plant failed an alarm-management audit. Shift Supervisor Frank Kowalski controls your work orders; Plant Manager Dana Voss controls whether you remain in the program. Every delay, unsupported answer, escalation, and shutdown is recorded.

The campaign loop

Follow the amber route immediately, take the assigned work, prove the required result, and report for debrief. Management will interrupt when you waste time. The qualification log records all 21 assignments and does not erase poor response history.

ESCO Automation Studio

Programming assignments open only from the marked ESCO workstation and remain locked until your actual project passes the requirement. Live production calls enable the prebuilt HMI with H and controller diagnostics with Tab. The brief gives context and one conceptual hint, never a completed rung or HMI answer.

Live fault calls

Travel to the affected equipment, compare field evidence with HMI values, logic, trends, and radio reports, then press Enter and submit the root-cause I/O tag such as TCV-2208.

Alarm escalation

TIER 1 — WARNING → TIER 2 — CRITICAL → TIER 3 — PLANT SHUTDOWN

Escalation windows are 95 seconds on early calls, 75 seconds on normal calls, and 55 seconds on hard calls. A shutdown is a strike and still requires an incident cause. Three strikes terminate the shift and send the failed assignment back to dispatch.

Controls

WASD move · Shift run · E interact · M plot plan · R radio and shift line · H live HMI · Tab live logic · O 0xSCADA operator station · Enter submit root cause · Esc pause

📻 MOTOROLA XPR — CH 2 «PLANT OPS» — PTT
KEY UP — TRANSMIT TO:
MESSAGE:
OPEN LINE - EVERYONE ON SHIFT:
⚒ SOLVE PROBLEM — IDENTIFY ROOT CAUSE I/O POINT
Enter the tagname of the I/O point causing the issue:
Every unsupported answer costs 100 points and records a failed decision. Format: letters-numbers, e.g. TT-2210, FCV-4112, M-3225.
PLANT 7 — PLOT PLAN
ROUND COMPLETE
PRAIRIE GOLD PROCESSING · PLANT 7 PERSONNEL DECISION

Qualification complete

The acceptance run is closed. The permanent record remains available for review.

STATUSQUALIFIEDSUPERVISED PLANT ACCESS
PROGRAM
12 WEEKS
ASSIGNMENTS
21 / 21
AVERAGE GATE
100%
ESCO ARCHIVE
8 / 8
MANAGEMENT DISPOSITION

Minimum Plant 7 qualification standard met. Technician is cleared for supervised controls work. Any future unsupported change, missed trip, or bypassed safety condition will reopen this review.

RECORDED --
SHIFT PAUSED
BACK TO KAX CITY